Critical Path Engineering Solutions, PLLC

Join the Critical Path Engineering Solutions, PLLC Team

Critical Path Engineering Solutions PLLC is an Environmental and Civil Engineering firm that operates in 2 main areas. 1. In the niche market of wastewater and industrial wastewater, including but not limited to food and beverage (breweries, distilleries, etc); manufacturing, chip manufacturing, wastewater plants, etc. 2. In Construction Observation and Inspection .  We are a WBE and NYSDOT DBE firm employing 5 to 9 people and run over $1M in revenue. The company is headquartered in Fayetteville, New York.

Company Benefits

Benefits may vary per position and employment status

Health Insurance
Dental Insurance
Vision Insurance
401(k)

Critical Path Engineering Solutions, PLLC Location(s)

Job Openings with Critical Path Engineering Solutions, PLLC

  • Page

Loading...

Your search did not match any current openings at Critical Path Engineering Solutions, PLLC, please check back later.

Uh oh! Something went wrong. Please check back later.
  • Page

Don't see a job opening that interests you?
Join our Talent Network to be considered for future opportunities at Critical Path Engineering Solutions, PLLC